Central Bedfordshire Council told the housing regulator and the Ombudsman it fell short of their rules. Its figures show 506 repair jobs over a year late.
Central Bedfordshire Council has reported itself to the Regulator of Social Housing for the second time in two years. It has also told the Housing Ombudsman that its complaint handling falls short of the Ombudsman’s code.
It is in a report to the council’s Landlord Assurance Board, which meets at 10am on Monday 23 November. The agenda and papers were published on 13 November.
Overview
- The council has “voluntarily notified” the regulator of concerns about the Transparency, Influence and Accountability Standard, the rule on keeping tenants informed and handling their complaints.
- It has also told the Housing Ombudsman that its complaint handling has not met all of the Ombudsman’s Complaint Handling Code.
- Its September figures show 506 non-emergency jobs with its smaller contractors more than a year overdue.
- Its main repairs contractor, Wates, finished 93.21% of due repairs on time in September, against a target of 96%.
- 325 council homes count as below the Decent Homes Standard, because the council has not been able to get in to survey them.
What the council has reported
The complaints and regulatory assurance report says both notifications were made “since the end of Quarter 2”, which is the end of September.
It says both came from the council’s own checks. The report calls them “a proactive approach to identifying, reporting and addressing compliance issues”. Improvement plans are in place, it adds, with governance arrangements to monitor them.
The report does not say which parts of each rule the council failed to meet. It does give one reason the two bodies count complaints differently. The regulator only counts a complaint as handled on time if both the acknowledgement and the reply went out on time.
The council’s September figures make the same point. Of 15 Stage 1 complaints answered that month, 14 were answered on time. But the performance pack says complaints “are not being acknowledged and processed quickly enough for initial investigation”.
This is not the first time
The council made its first self-referral to the regulator in November 2024. That was about whether its health and safety records could be trusted.
The regulator inspected and, in February 2025, gave the council a C3 consumer grade. It found “serious failings” and said “significant improvement is needed”. The failings were in two standards: Safety and Quality, and the same Transparency, Influence and Accountability Standard now reported again.
Grades run from C1, the best, to C4. The February 2025 judgement is still the latest the regulator has published for the council.
The repair figures
The housing performance pack for September 2026 splits repairs between Wates, the main contractor, and the council’s other contractors.
For Wates in September:
- 93.21% of due repairs were finished on time, down from 98.18% in April
- 99.74% of emergency repairs were on time, against a 99% target
- 1,353 jobs were completed and 1,516 new ones raised
- the average job took 10.9 days, up from 7.8 in April
- 90.46% of tenants surveyed after a repair were satisfied, against a 95% target
The pack says most of Wates’s overdue jobs are disrepair claims where staff could not get into the home “despite multiple attempts”. The rest are jobs high up that need scaffolding designed first.
The other contractors look very different:
| September 2026 | Other contractors |
|---|---|
| Jobs outstanding | 1,096 |
| Share of those overdue | 73.27% |
| Non-emergency jobs more than a year overdue | 506 |
| Repairs completed on time | 54.66% |
The on-time rate for these contractors was 30.41% in July and 47.87% in August. The council does not name them in the pack.
The council adds a warning about these numbers. Its system records repairs, servicing and inspection visits together as “works orders”, it says, and a data clean-up is under way to separate them. So the 506 may include jobs that are not repairs.
Safety checks and decent homes
Most safety checks are at or close to 100%. Two are not:
- in September, the council reached 92.31% of immediate hazards within 24 hours, against a 100% target
- 94.48% of significant hazards were visited within ten working days
Gas safety certificates covered 99.78% of homes and electrical safety reports 98.31%.
Of 5,829 council homes, the pack counts 325 (6%) as below the Decent Homes Standard. It says every one of those is down to “a lack of access for survey purposes”. All the others meet the standard.
The pack also covers the council blocks at Morcom Road and Southwood Road in Dunstable, about eight miles east of Leighton Buzzard. All the blocks were inspected with the fire service’s building safety team and “formally signed off as safe for occupation”. A joint re-inspection every six months has been agreed, and every block now has a monitored communal fire alarm.
Complaints
Housing Services received 223 complaints across the two quarters the report covers, and 196 went through the formal process. The commonest causes were:
- delays and failures to act
- repairs and workmanship, including damp and mould
- poor communication, with tenants having to chase for updates
- decisions and processes, including vulnerabilities not taken into account
In September, 13 complaints were escalated to Stage 2, a 20% escalation rate. Four of the six Stage 2 replies that month were on time.
The report found many tenants escalate a complaint the council has already upheld. They do so, it says, because the remedy or the investigation fell short, or because the problem itself was still not fixed.
What it means for you
If you rent from the council and a repair is overdue, you can complain to the council’s housing service. If you are unhappy with its final reply, the Housing Ombudsman can look at it.
The pack puts no access behind all 325 homes counted below the Decent Homes Standard, and behind most of Wates’s overdue jobs. If the council has asked to survey your home or carry out a safety check, that is what it is chasing.